Thursday, May 2, 2024

Featured Video

Latest Stories

Top 10 Music

[showmfm]

Upcoming Events

[showevents]

MALAWI’S POWER PLAN AFFECTED BY CORONAVIRUS

As the Covid-19 pandemic continues to threaten economies world over, with four confirmed cases registered in Malawi so far, the country is set to endure the dependence of diesel power generators which have proved to be injurious to the economy for at least the next three months, the government has said.

Minister of Energy Atupele Muluzi said that the government has had to push forward timelines for Independent Power Producers (IPPs), some of whom were supposed to roll out their operations this month.

According to Muluzi, the expedition of the Zambia- Malawi power line may also take a bit of time, thereby forcing the country to continue relying on the costly diesel generated power supply in the wake of the unreliable hydropower.

“We were expecting an addition of approximately between 60 and a 100 Megawatts (MW) from IPPs coming online around April this year, however because of the coronavirus and the fact that we have a global slowdown in terms of travel and activity it means we have to push those timelines forward. We expected that by at least this time we would have reduced the dependence on diesel gensets but such won’t be the case,” Muluzi disclosed.

He said engagements with IPPs like JCM are at an advanced stage and have proved will benefit the country.

On the Zambia-Malawi power interconnector, Muluzi who visited the National Power Control Center for Electricity Supply Corporation of Malawi (Escom) said the government is looking at a period of about 12 months to complete all the processes of expediting the move.

“We can begin to find ways of how we can expedite the interconnection especially in Zambia where we think it is possible to do that within a period of 12 months, it’s still lengthy but I think these are the shorter measures,” Muluzi added.

Related Posts

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Popular Articles